Skip to Content

Shawinigan Horizontal Directional Drilling Project

In 2018, the City of Shawinigan, Quebec experienced rapid growth that required expansion of its municipal water and sewer infrastructure. A key component of this upgrade involved installing a new 400 mm water pipeline beneath the St. Maurice River, a crossing nearly one kilometre wide. Traditional open-cut construction was not feasible due to the environmental sensitivity of the river and the significant surface disruption it would create.

To complete the crossing efficiently while protecting the surrounding environment, Marathon Underground implemented Horizontal Directional Drilling (HDD), a trenchless technology that allows underground utilities to be installed along a precise underground path using a surface-launched drilling rig. HDD significantly reduces surface disturbance compared with conventional excavation methods, making it ideal for river crossings, roadways, and other sensitive environments.

The project was executed using the standard HDD process. First, a pilot hole was drilled along a carefully planned underground alignment beneath the river. The borehole was then progressively enlarged through a series of reaming passes to accommodate the final pipeline diameter. Finally, the 400 mm watermain was pulled back through the enlarged bore, creating a continuous underground pipeline exposed only at the entry and exit points.

At over one kilometre in length, the installation represented a particularly challenging HDD crossing, conducted almost entirely through solid rock formations. Long rock bores of this scale demand specialized equipment, precise drilling control, and highly experienced crews. Marathon Underground successfully delivered the project using advanced drilling technology, skilled operators, and expert project management, ensuring the installation was completed safely, efficiently, and on schedule while maintaining minimal environmental impact on the St. Maurice River corridor.

Client

Ville de Shawinigan

Location

Shawinigan, QC

Year

2018–2019

Service

Horizontal Directional Drilling (HDD)

Application

Municipal Water Infrastructure Expansion

Installation

400 mm Water Pipeline

Crossing Length

Approximately 1 km beneath the St. Maurice River

Ground Conditions

Primarily Solid Rock